The electrical scheme for this school required for a complete rewire of all the lighting, emergency lighting, power, door access and distribution systems throughout the main school buildings, carried out over two phases. The first phase was carried out as instructed within the construction drawings and specification. The second phase was based on the same principals as the previous phase but the design element, specification and drawings were all produced in-house. Both phases were based on the installation of new surface steel containment for all accessories.

The first part of the overall scheme to be carried out at this school was the installation of a new fire alarm system throughout the school property. This was carried out using a conventional fire alarm system providing a category L2 protection, as instructed, based on a design produced in-house.

St Teresa’s RC Primary School – Essex